23 March 1965: At 14:24:00 UTC, Gemini III was launched aboard a Titan II GLV rocket from Launch Complex 19 at the Cape Kennedy Air Force Station, Cape Canaveral, Florida. Major Virgil I. (“Gus”) Grissom, United States Air Force, a Project Mercury veteran, was the Spacecraft Commander, and Lieutenant Commander John W. Young, United States Navy, was the pilot.
The purpose of the mission was to test spacecraft orbital maneuvering capabilities that would be necessary in later flights of the Gemini and Apollo programs. Gemini III made three orbits of the Earth, and splashed down after 4 hours, 52 minutes, 31 seconds. Miscalculations of the Gemini capsule’s aerodynamics caused the spacecraft to miss the intended splash down point by 50 miles (80 kilometers). Gemini III splashed down in the Atlantic Ocean, north east of the Turks and Caicos Islands. The recovery ship was USS Intrepid (CV-11).
Gus Grissom would later command the flight crew of Apollo 1. He was killed with his crew during the tragic fire during a pre-launch test, 27 January 1967.
John Young served as Spacecraft Commander for Gemini 10, Command Module Pilot on Apollo 10, back-up commander for Apollo 13, commander Apollo 16, and back-up commander for Apollo 17. Later, he was commander of the maiden flight of the space shuttle Columbia STS-1 and again for STS-9 and was in line to command STS-61J.
The two-man Gemini spacecraft was built by the McDonnell Aircraft Corporation of St. Louis, the same company that built the earlier Mercury space capsule. The spacecraft consisted of a reentry module and an adapter section. It had an overall length of 19 feet (5.791 meters) and a diameter of 10 feet (3.048 meters) at the base of the adapter section. The reentry module was 11 feet (3.353 meters) long with a diameter of 7.5 feet (2.347 meters). The weight of the Gemini varied from ship to ship but was approximately 7,000 pounds (3,175 kilograms).
The Titan II GLV was a “man-rated” variant of the Martin SM-68B intercontinental ballistic missile. It was assembled at Martin’s Middle River, Maryland plant so as not to interfere with the production of the ICBM at Denver, Colorado. Twelve GLVs were ordered by the Air Force for the Gemini Program.
The Titan II GLV was a two-stage, liquid-fueled rocket. The first stage was 70 feet, 2.31 inches (21.395 meters) long with a diameter of 10 feet (3.048 meters). It was powered by an Aerojet Engineering Corporation LR87-7 engine which combined two combustion chambers and exhaust nozzles with a single turbopump unit. The engine was fueled by Aerozine 50, a hypergolic 51/47/2 blend of hydrazine, unsymetrical-dimethyl hydrazine, and water. Ignition occurred spontaneously as the components were combined in the combustion chambers. The LR87-7 produced approximately 430,000 pounds of thrust (1,912.74 kilonewtons). It was not throttled and could not be shut down and restarted. Post flight analysis indicated that the first stage engine of GLV-8 had produced an average of 461,080 pounds of thrust ( kilonewtons).
The second stage was 25 feet, 6.375 inches (7.782 meters) long, with the same diameter, and used an Aerojet LR91 engine which produced approximately 100,000 pounds of thrust (444.82 kilonewtons), also burning Aerozine 50. GLV-7’s LR91 produced an average of 102,735 pounds of thrust ( kilonewtons).
The Gemini III/Titan II GLV combination had a total height of 107 feet, 7.33 inches (32.795 meters) and weighed 340,000 pounds (156,652 kilograms) at ignition.
The Gemini III spacecraft is displayed at the Grissom Memorial Museum, Spring Mill State Park, Mitchell, Indiana.
© 2019, Bryan R. Swopes