Gemini III lifts off at Launch Complex 19, Cape Kennedy Air Force Station, Cape Canaveral, Florida, 14:24:00 UTC, 23 March 1965. (NASA)
23 March 1965: At 14:24:00.064 UTC, Gemini III was launched aboard a Titan II GLV rocket from Launch Complex 19 at the Cape Kennedy Air Force Station, Cape Canaveral, Florida. Major Virgil Ivan (“Gus”) Grissom, United States Air Force, a Project Mercury veteran, was the Spacecraft Commander, and Lieutenant Commander John Watts Young, United States Navy, was the pilot.
The purpose of the mission was to test spacecraft orbital maneuvering capabilities that would be necessary in later flights of the Gemini and Apollo programs
The spacecraft entered a 100.2 mile (161.2 kilometer) × 139.3 mile (224.2 kilometer) orbit, with an orbital period of 88 minutes, 18 seconds. At the end of the first orbit, Grissom used the Orbital Attitude and Maneuver System (OAMS) to move Gemini III into a 98.2 mile (158 kilometer) × 105 mile (169 kilometer) near circular orbit. During the third orbit, the spacecraft descended to 52 miles (84 kilometers) to allow normal orbital decay should the retro rocket system fail.
Gemini III made three orbits of the Earth, and splashed down after 4 hours, 52 minutes, 31 seconds. Miscalculations of the Gemini capsule’s aerodynamics caused the spacecraft to miss the intended splash down point by 69 miles (111 kilometers). Gemini III splashed down in the Atlantic Ocean at N. 22.43°, W. 70.85°, northeast of the Turks and Caicos Islands. The recovery ship was the Essex-class aircraft carrier USS Intrepid (CVS-11).
Gus Grissom would later command the flight crew of Apollo 1. He was killed with his crew during the tragic fire during a pre-launch test, 27 January 1967.
John Young served as Spacecraft Commander for Gemini 10, Command Module Pilot on Apollo 10, back-up commander for Apollo 13, commander Apollo 16, and back-up commander for Apollo 17. Later, he was commander of the maiden flight of the space shuttle Columbia STS-1 and again for STS-9 and was in line to command STS-61J when it was cancelled following the loss of the Space Shuttle Challenger.
The flight crew of Gemini III, Lieutenant Commander John W. Young, U.S. Navy, and Major Virgil I. Grissom, U.S. Air Force. (NASA)
The two-man Gemini spacecraft was built by the McDonnell Aircraft Corporation of St. Louis, the same company that built the earlier Mercury space capsule. The spacecraft consisted of a reentry module and an adapter section. It had an overall length of 19 feet (5.791 meters) and a diameter of 10 feet (3.048 meters) at the base of the adapter section. The reentry module was 11 feet (3.353 meters) long with a diameter of 7.5 feet (2.347 meters). The weight of the Gemini varied from ship to ship but was approximately 7,000 pounds (3,175 kilograms).
Artist’s concept of Gemini spacecraft, 3 January 1962. (NASA-S-65-893)
The Titan II GLV was a “man-rated” variant of the Martin SM-68B intercontinental ballistic missile. It was assembled at Martin’s Middle River, Maryland plant so as not to interfere with the production of the ICBM at Denver, Colorado. Twelve GLVs were ordered by the Air Force for the Gemini Program.
Titan II GLV, (NASA Mission Report, Figure 3-1, at Page 3–23)
The Titan II GLV was a two-stage, liquid-fueled rocket. The first stage was 70 feet, 2.31 inches (21.395 meters) long with a diameter of 10 feet (3.048 meters). It was powered by an Aerojet Engineering Corporation LR87-7 engine which combined two combustion chambers and exhaust nozzles with a single turbopump unit. The engine was fueled by Aerozine 50, a hypergolic 51/47/2 blend of hydrazine, unsymetrical-dimethyl hydrazine, and water. Ignition occurred spontaneously as the components were combined in the combustion chambers. The LR87-7 produced approximately 430,000 pounds of thrust (1,912.74 kilonewtons). It was not throttled and could not be shut down and restarted. Post flight analysis indicated that the first stage engine of GLV-8 had produced an average of 461,080 pounds of thrust (2,050.986 kilonewtons).
The second stage was 25 feet, 6.375 inches (7.782 meters) long, with the same diameter, and used an Aerojet LR91 engine which produced approximately 100,000 pounds of thrust (444.82 kilonewtons), also burning Aerozine 50. GLV-7’s LR91 produced an average of 102,735 pounds of thrust (456.988 kilonewtons).
The Gemini III/Titan II GLV combination had a total height of 107 feet, 7.33 inches (32.795 meters) and weighed 340,000 pounds (156,652 kilograms) at ignition.
The Gemini III spacecraft is displayed at the Grissom Memorial Museum, Spring Mill State Park, Mitchell, Indiana.
Dr. Wernher von Braun, Director, Marshall Space Flight Center, 1 May 1964. (NASA)
23 March 1912: Wernher Magnus Maximilian Freiherr von Braun, rocket engineer, was born at Wyrzysk, Province of Posen, in the German Empire, in what is now Poland. He was the second of three children of Magnus Alexander Maximillian von Braun, head of the Posen provincial government, and Emmy Melitta Cécile von Quistorp.
Wernher von Braun, at center, with his brothers, Magnus (left) and Sigismund (right). (NASA)
Wernher von Braun originally wanted to be a musician and composer, having learned to play the cello and piano at an early age. After reading a speculative book on space flight, though, his interests shifted.
In 1929, the 17-year-old von Braun joined Verein für Raumschiffahrt, the German rocketry association. He worked with Hermann Oberth in testing liquid-fueled rockets, based on successful rockets designed by Dr. Robert H. Goddard in the United States.
Rudolf Nebel (left) and Wernher von Braun with small liquid-fueled rockets, circa 1930. (Unattributed)
Von Braun graduated from Technische Hochschule Berlin in 1932, with a degree in mechanical engineering (Diplom-Ingenieur). Two years later, he received a doctorate in physics (Dr. phil.) at Friederich-Wilhelm University of Berlin. He also studied at ETH Zürich.
In Germany before World War II, Dr.-Ing. von Braun worked on the problems of liquid-fueled rockets and developed the Aggregat series of rockets, including the A4, which would become known as the V-2 (Vergeltungswaffe 2) military rocket. The German Army’s Ordnance Department gave von Braun a grant to further study liquid-fueled rockets, which he pursued at an artillery range at Kummersdorf, just south of Berlin
As rocketry work expanded, the tests were eventually moved to the Peenemünde Military Test Site on the island of Usedom on the Baltic coast, where von Braun was technical director under Colonel Dr. Ing. Walter R. Dornberger.
Prof. Dr.-Ing. Wernher von Braun with a number of German officers at Peenemünde, March 1941. (Left to right) Colonel Dr. Ing. Walter Dornberger (partially out of frame), General der Infanterie Friederich Olbricht*, Major Heinz Brandt, Prof. Dr. von Braun; others not identified. (Bundesarchiv, Bild 146-1978-Anh.024-03/CC-BY-SA 3.0) [*General Olbricht developed Operation Valkyrie, the plot to assassinate Hitler and overthrow the Nazi regime.]Aggregat 4 prototype (probably V-3) ready for launch at Prüfstand VII, August 1942. (Bundesarchiv)
The first successful launch of the A4 took place 3 October 1942. By the end of World War II, Nazi Germany had launched more than 3,200 V-2 rockets against Belgium, England, France and The Netherlands.
V-2 rocket launch at Peenemünde, on the island of Usedom in the Baltic Sea. (Bundesarchiv)
As World War II in Europe came to a close and the collapse of Nazi Germany was imminent, von Braun had to choose between being captured by the Soviet Red Army or by the Allies. He surrendered to the 324th Infantry Regiment, 44th Infantry Division, United States Army in the Bavarian Alps, 2 May 1945.
Major-General Dr. Ing. Walter R. Dornberger; Lieutenant-Colonel Herbert Axster, Dornberger’s chief of staff; Prof. Dr.-Ing. Wernher von Braun (with left arm in cast); and Hans Lindenberg, chief propulsion engineer; at Reutte, Austria, 3 May 1945. (Technician 5th Class Louis Weintraub, U.S. Army)
Under Operation Paperclip, Wernher von Braun and many other scientists, engineers and technicians were brought to the United States to work with the U.S. Army’s ballistic missile program at Fort Bliss, Texas, White Sands Proving Grounds, New Mexico, and the Redstone Arsenal, Huntsville, Alabama.
A-4 Number 3 is prepared for launch at White Sands Proving Grounds, New Mexico, 10 May 1946. With a burn time of 59 seconds, the rocket reached an altitude of 70.9 miles (114.1 kilometers) and traveled 31 miles (49.9 kilometers) down range. (The Space Race – Rockets)
Sufficient parts and materiel had been transferred from Germany to construct more than one hundred V-2 rockets for testing at White Sands. Over a five year period, there were 67 successful launches, but it is considered that as much knowledge was gained from failures as successes.
Dr. von Braun with V-2 rocket components at White Sands Proving Grounds, New Mexico, 1 November 1946. (Thomas D. McAvoy)
In 1950, von Braun and his team were sent to Redstone Arsenal, Huntsville, Alabama, where they worked on more advanced rockets. The first production rocket was the short-range ballistic missile, the SSM-A-14 Redstone, which was later designated PGM-11. This rocket was capable of carrying a 3.8 megaton W39 warhead approximately 200 miles (322 kilometers) The first Redstone was launched at Cape Canaveral Air Force Station, 20 August 1953.
Compare the military Redstone SSM-A-14 in this photograph to the Mercury-Redstone rocket in the photograph below. This rocket, CC-1002, was the first Block 1 tactical rocket. (MSFC-580069)
Modified Redstone MRLV rockets were used to launch the first Mercury spacecraft with NASA astronauts Alan Shepherd and Gus Grissom. Von Braun later worked on the U.S. Army’s Jupiter-A intermediate range ballistic missile. A modified Jupiter-C was used to launch Explorer 1, the United States’ first satellite.
Explorer 1 launch, Launch Complex 26A, Cape Canaveral Air Force Station, 1 February 1958, 03:48:00 UTC. (NASA)Explorer VII/Juno II launch, from LC-5, Cape Canaveral Air Force Station, 13 October 1959. (NASA MSFC-5900711)Mercury-Redstone 4 (Liberty Bell 7) launch at Pad 5, Cape Canaveral Air Force Station, 12 20 36 UTC, 21 July 1961. (NASA)
Wernher von Braun traveled to Germany in 1947 to marry his cousin, Maria Irmengard Emmy Luise Gisela von Quistorp, and then returned to the United States. He became a naturalized citizen of the United States of America in 1955.
Prof. Dr. von Braun with his family, circa 1957. Left to right, Maria Luise von Braun, Margrit Cécile von Braun, Dr. von Braun and Iris Careen von Braun. (U.S. Army)
In 1960 von Braun and his team were transferred from the Army Ballistic Missile Agency to NASA’s new Marshall Space Flight Center at Redstone Arsenal. He was now able to pursue his original interest, manned flight into space. Work proceeded on the Saturn rocket series, which were intended to lift heavy payloads into Earth orbit. This resulted in the Saturn A, Saturn B and the Saturn C series, ultimately becoming the Saturn V moon rocket.
Saturn SA-1 accelerates after liftoff, 27 October 1962. (NASA)Apollo-Saturn IB AS-201 launch from Pad 34, Kennedy Space Center, 26 February 1966. (NASA)
With the Apollo Program coming to an end, Dr. von Braun left NASA in 1972. A year later, he was diagnosed with kidney cancer. Wernher von Braun died of pancreatic cancer, 17 June 1977 at the age of 65 years.
Apollo 4 Saturn V (AS-501) on the launch pad at sunset, the evening before launch, 8 November 1967. (NASA)Saturn V first stage F-1 engines running, producing 7.5 million pounds of thrust. Ice falls from the rocket. The hold-down arms have not yet been released. (NASA)Dr. von Braun pauses in front of the Apollo 11/Saturn V at the Kennedy Space Center (KSC). (NASA MSFC-6901046)
Gemini VIII lifts off from Launch Complex 19, Cape Kennedy Air Force Station, 16:41:02 UTC, 16 March 1966. (NASA)
16 March 1966: At 16:41:02.389 UTC (12:41:02 p.m. Eastern Standard Time), forty years to the day after the launch of Dr. Robert Goddard’s first liquid-fueled rocket, Gemini VIII, with command pilot Neil Alden Armstrong and pilot David Randolph Scott, lifted off from Launch Complex 19 at the Cape Kennedy Air Force Station, Cape Kennedy, Florida, aboard a Titan II GLV booster. Their mission was to rendezvous and dock with an Agena Target Vehicle launched earlier aboard an Atlas rocket.
Gemini VIII entered a 86.3 × 146.7 nautical mile (99.3 × 168.8 statute miles/160 × 271.7 kilometers) elliptical orbit. The spacecraft was traveling at 17,549 miles per hour (28,242 kilometers per hour).
The Gemini Agena Target Vehicle seen from Gemini VIII, 16 March 1966. (David R. Scott, NASA)
The docking, the first ever of two vehicles in Earth orbit, was successful, however after about 27 minutes the combined vehicles begin rolling uncontrollably. The Gemini capsule separated from the Agena, and for a few minutes all seemed normal. But the rolling started again, reaching as high as 60 r.p.m.
The astronauts were in grave danger. Armstrong succeeded in stopping the roll but the Gemini’s attitude control fuel was dangerously low.
David R. Scott and Neil A. Armstrong, flight crew of Gemini VIII. (NASA)
The pilots’ report reads:
Shortly after sending encoder command 041 (recorder ON), roll and yaw rates were observed to be developing. No visual or audible evidence of spacecraft thruster firing was noted, and the divergence was attributed to the GATV.
Commands were sent to de-energize the GATV ACS, geocentric rate, and horizon sensors, and the spacecraft Orbital Attitude and Maneuver System (OAMS) was activated.
The rates were reduced to near zero, but began to increase upon release of the hand controller. The ACS was commanded on to determine if GATV thruster action would help reduce the angular rates. No improvement was noted and the ACS was again commanded off. Plumes from a GATV pitch thruster were visually observed, however, during a period when the ACS was thought to be inactivated.
After a period of relatively stable operation, the rates once again began to increase. The spacecraft was switched to secondary bias power, secondary logics, and secondary drivers in an attempt to eliminate possible spacecraft control-system discrepancies. No improvement being observed, a conventional troubleshooting approach with the OAMS completely de-energized was attempted, but subsequently abandoned because of the existing rates.
An undocking was performed when the rates were determined to be low enough to precluded any recontact problems. Approximately a 3 ft/sec velocity change was used to effect separation of the two vehicles.
Angular rates continued to rise, verifying a spacecraft control-system problem. The hand controller appeared to be inactive. The Reentry Control System (RCS) was armed and, after trying ACME-DIRECT and then turning off all OAMS control switches and circuit breakers, was found to be operative in DIRECT-DIRECT. Angular rates were reduced to small values with the RCS B-ring. Inspection of the OAMS revealed that the no. 8 thruster had failed to open. Some open Attitude Control and Maneuver Electronics (ACME) circuit breakers probably accounted for the inoperative hand controller noted earlier. All yaw thrusters other than number 8 were inoperative. Pitch and roll control were maintained using the pitch thrusters. . .
All four retrorockets fired on time. . . .
—GEMINI PROGRAM MISSION REPORT, GEMINI VIII, Gemini Mission Evaluation Team, National Aeronautics and Space Administration, Manned Spacecraft Center, Houston, Texas, , MSC-G-R-66-4, Section 7 at Pages 7-21 and 7-22
The mission was aborted and the capsule returned to Earth after 10 hours, 41 minutes, 26.0 seconds, landing in the Pacific Ocean at N. 25° 12′, E. 136° 05′. U.S. Air Force pararescue jumpers (“PJs”) parachuted from a Douglas C-54 transport and attached a flotation collar to the Gemini capsule. The astronauts were recovered by the Gearing-class destroyer USS Leonard F. Mason (DD-852), about three hours later..
The Gemini VIII spacecraft is displayed at the Neil Armstrong Air and Space Museum, Wapakoneta, Ohio.
Gemini VIII with flotation collar. (NASA)
The two-man Gemini spacecraft was built by the McDonnell Aircraft Corporation of St. Louis, Missouri, the same company that built the earlier Mercury space capsule. The spacecraft consisted of a series of cone-shaped segments forming a reentry module and an adapter section. It had an overall length of 18 feet, 9.84 inches (5.736 meters) and a maximum diameter of 10 feet, 0.00 inches (3.048 meters) at the base of the equipment section. The reentry module was 11 feet (3.353 meters) long with a maximum diameter of 7 feet, 6.00 inches (2.347 meters). The Gemini re-entry heat shield was a spherical section with a radius of 12 feet, 0.00 inches (3.658 meters). The weight of the Gemini spacecraft varied from ship to ship. Gemini VIII weighed 8,351.31 pounds (3,788.09 kilograms) at launch. Spacecraft 8 was shipped from the St. Louis factory to Cape Kennedy on 2 January 1966.
Artist’s concept of Gemini spacecraft, 3 January 1962. (NASA-S-65-893)
The Titan II GLV was a “man-rated” variant of the Martin SM-68B intercontinental ballistic missile. It was assembled at Martin’s Middle River, Maryland plant so as not to interfere with the production of the ICBM at Denver, Colorado. Twelve GLVs were ordered by the Air Force for the Gemini Program.
Titan II GLV, (NASA Mission Report, Figure 3-1, at Page 3–23)
The Titan II GLV was a two-stage, liquid-fueled rocket. The first stage was 70 feet, 2.31 inches (21.395 meters) long with a diameter of 10 feet (3.048 meters). It was powered by an Aerojet Engineering Corporation LR87-7 engine which combined two combustion chambers and exhaust nozzles with a single turbopump unit. The engine was fueled by Aerozine 50, a hypergolic 51/47/2 blend of hydrazine, unsymetrical-dimethyl hydrazine, and water. Ignition occurred spontaneously as the components were combined in the combustion chambers. The LR87-7 produced approximately 430,000 pounds of thrust (1,912.74 kilonewtons). It was not throttled and could not be shut down and restarted. Post flight analysis indicated that the first stage engine of GLV-8 had produced an average of 461,080 pounds of thrust ( kilonewtons).
The second stage was 25 feet, 6.375 inches (7.782 meters) long, with the same diameter, and used an Aerojet LR91 engine which produced approximately 100,000 pounds of thrust (444.82 kilonewtons), also burning Aerozine 50. GLV-7’s LR91 produced an average of 102,735 pounds of thrust ( kilonewtons).
The Gemini/Titan II GLV VIII combination had a total height of 107 feet, 7.33 inches (32.795 meters) and weighed 345,359 pounds (156,652 kilograms) at ignition.
The Atlas-Agena Target Vehicle takes off at Launch Complex 14, Cape Kennedy Air Force Station, 15:00:03 UTC, 16 March 1966. (NASA)
Apollo 9 Saturn V (AS-504) launches from Pad 39A, at 11:00:00 a.m., EST, 3 March 1969. (NASA)
3 March 1969: At 11:00:00 a.m. Eastern Standard Time (16:00:00 UTC), Apollo 9 Saturn V (AS-504), the second manned Saturn V rocket, is launched from Launch Complex 39A at the Kennedy Space Center, Cape Canaveral, Florida. Aboard are astronauts Colonel James Alton McDivitt, U.S. Air Force, the Spacecraft Commander; Colonel David Randolph Scott, U.S. Air Force, Command Module Pilot; and Mr. Russell Louis Schweickart (formerly an Air Force pilot), Lunar Module Pilot. McDivitt and Scott were on their second space flight. Rusty Schweickert was on his first.
The 10-day Earth orbital mission is used to test docking-undocking with the lunar module, and to certify the LM as flight-worthy. This was necessary before the program could proceed to the next phase: The Moon.
The flight crew of Apollo 9, James A. McDivitt, David R. Scott and Russell L. Schweickart. AS-504 is in the background. (NASA)
The Apollo Command/Service Module was built by the Space and Information Systems Division of North American Aviation, Inc., at Downey, California.
The SPS engine was an AJ10-137, built by Aerojet General Corporation of Azusa, California. It burned a hypergolic fuel combination of Aerozine 50 and nitrogen tetraoxide, producing 20,500 pounds of thrust (91.19 kilonewtons). It was designed for a 750 second burn, or 50 restarts during a flight.
Astronaut David R. Scott stands in the open hatch of the Apollo Command Module “Gumdrop” in Earth Orbit, 6 March 1969. (Russell L. Schweickart/NASA)
The Apollo Lunar Module was built by Grumman Aerospace Corporation to carry two astronauts from lunar orbit to the surface, and return. There was a descent stage and ascent stage. The LM was intended only for operation in the vacuum of space, and was expended after use.
Three-view drawing of the Lunar Module with dimensions. (NASA)
The LM was 23 feet, 1 inches (7.036 meters) high with a maximum landing gear spread of 31 feet (9.449 meters). It weighed 33,500 pounds (15,195 kilograms). The spacecraft was designed to support the crew for 48 hours, though in later missions, this was extended to 75 hours.
The Descent Stage was powered by a single TRW LM Descent Engine. The LMDE used hypergoloc fuel and was throttleable. It produced from 1,050 pounds of thrust (4.67 kilonewtons) to 10,125 pounds (45.04 kilonewtons). The Ascent Stage was powered by a Bell Aerospace Lunar Module Ascent Engine. This also used hypergolic fuels. It produced 3,500 pounds of thrust (15.57 kilonewtons).
Apollo 9 Lunar Module “Spider” (Apollo LM-3) in Earth orbit, 7 March 1969. (Dave Scott/NASA)
The Saturn V rocket was a three-stage, liquid-fueled heavy launch vehicle. Fully assembled with the Apollo Command and Service Module, it stood 363 feet (110.642 meters) tall. The first and second stages were 33 feet (10.058 meters) in diameter. Fully loaded and fueled the rocket weighed 6,200,000 pounds (2,948,350 kilograms). It could lift a payload of 260,000 pounds (117,934 kilograms) to Low Earth Orbit.
The first stage was designated S-IC. It was designed to lift the entire rocket to an altitude of 220,000 feet (67,056 meters) and accelerate to a speed of more than 5,100 miles per hour (8,280 kilometers per hour). The S-IC stage was built by Boeing at the Michoud Assembly Facility, New Orleans, Louisiana. It was 138 feet (42.062 meters) tall and had an empty weight of 290,000 pounds (131,542 kilograms). Fully fueled with 203,400 gallons (770,000 liters) of RP-1 and 318,065 gallons (1,204,000 liters) of liquid oxygen, the stage weighed 5,100,000 pounds (2,131,322 kilograms). It was propelled by five Rocketdyne F-1 engines, producing 1,522,000 pounds of thrust (6770.19 kilonewtons), each, for a total of 7,610,000 pounds of thrust at Sea Level (33,850.97 kilonewtons). These engines were ignited seven seconds prior to lift off and the outer four burned for 168 seconds. The center engine was shut down after 142 seconds to reduce the rate of acceleration. The F-1 engines were built by the Rocketdyne Division of North American Aviation at Canoga Park, California.
The S-II second stage was built by North American Aviation at Seal Beach, California. It was 81 feet, 7 inches (24.87 meters) tall and had the same diameter as the first stage. The second stage weighed 80,000 pounds (36,000 kilograms) empty and 1,060,000 pounds loaded. The propellant for the S-II was liquid hydrogen and liquid oxygen. The stage was powered by five Rocketdyne J-2 engines, also built at Canoga Park. Each engine produced 232,250 pounds of thrust (1,022.01 kilonewtons), and combined, 1,161,250 pounds of thrust (717.28 kilonewtons).
The Saturn V third stage was designated S-IVB. It was built by McDonnell Douglas Astronautics Company at Huntington Beach, California. The S-IVB was 58 feet, 7 inches (17.86 meters) tall with a diameter of 21 feet, 8 inches (6.604 meters). It had a dry weight of 23,000 pounds (10,000 kilograms) and fully fueled weighed 262,000 pounds. The third stage had one J-2 engine and also used liquid hydrogen and liquid oxygen for propellant. The S-IVB would place the Command and Service Module into Low Earth Orbit, then, when all was ready, the J-2 would be restarted for the Trans Lunar Injection.
Eighteen Saturn V rockets were built. They were the most powerful machines ever built by man.
Apollo-Saturn IB AS-201 launch from Pad 34, Kennedy Space Center, 26 February 1966. (NASA)
26 February 1966: AS-201, the first Apollo/Saturn IB, was launched, carrying the first complete Block 1 Apollo Command and Service Module on an unmanned suborbital test flight. The launch took place at Launch Complex 34, Cape Kennedy Air Force Station, Cape Kennedy, Florida.
An illustration of an Apollo/Saturn IB space vehicle, with approximate dimensions. (Department of Special Collections, M. Louis Salmon Library, University of Alabama, via heroicrelics.org)
This flight was a demonstration of the combined Apollo Command Module and the Service Module. The second production Apollo capsule, CM-009, and the first production service module, SM-009, were launched by the first Saturn IB, SA-201.¹ (When combined, the capsule and service module are referred to as the CSM.)
The command to ignite the eight H-1 first stage engines was sent from the Mission Control Room at T-3.038 (16:11:56.962 UTC).² The engines ignited at T-2.45 and began to build thrust. First motion occurred at T+0.11.
Liftoff ³ was at 16:12:01.37 UTC, T+0.37. AS-201 climbed vertically for 11.2 seconds before beginning a pitch and roll maneuver which carried the space vehicle to its planned trajectory. Control of the mission was shifted from the Cape Kennedy Air Force Station to Mission Control at the Manned Spacecraft Center, Houston, Texas. Flight Director Glynn S. Lunney was now in charge.
AS-201 reached Mach 1 at T+65.7. The vehicle experienced its maximum dynamic pressure (max q) at T+77.7.
Maximum acceleration was reached at T+141.5, just as the first stage engines were shut down.
The S-IB first stage inner engines cutoff (IECO) occurred at T+141.5, and outer engine cutoff (OECO), at T+146.9. The vehicle had reached an altitude of 31.4 nautical miles (36.1 statute miles/58.2 kilometers) and was 33.9 nautical miles (39.0 statute miles/62.8 kilometers) downrange. It was traveling at 7,499.66 feet per second (5,113.4 miles per hour/8,229.2 kilometers per hour). The first stage was jettisoned.
Apollo/Saturn IB AS-201 first stage separation. (NASA)
The S-IVB second stage engine ignition occurred at T+149.3. The Launch Escape System (LES) was jettisoned at T+172.6. The vehicle continued to accelerate until its J-2 engine cut off at T+602.9. The vehicle had now reached an altitude of 141.2 nautical miles (162.5 statute miles/261.5 kilometers) and was 857.9 nautical miles (987.3 statute miles/1,588.8 kilometers) downrange, traveling 22,769.23 feet per second (15,524.5 miles per hour/24,984.2 kilometers per hour). The S-IVB and Command and Service Module separated at T+844.9.
The Apollo CSM reached a maximum altitude (apogee) of 265.7 nautical miles (305.8 miles/492.1 kilometers) at T+1020.0. As it began to descend, the Service Module’s Service Propulsion Subsystem (SPS) was tested. The SPS was powered by a non-throttleable, restartable, AJ10-137 rocket engine, built by Aerojet General Corporation of Azusa, California. This engine was fueled by Aerozine 50, a hypergolic 50:50 mixture of Unsymmetrical dimethylhydrazine (UDMH) and nitrogen tetroxide (N2O4). It produced 20,500 pounds of thrust (91.19 kilonewtons) in vacuum. It was designed for a 750 second burn, or 50 restarts during a flight. The first burn was from T+1211.2 –1395.2 (184 seconds), and the second, from T+1410.7–1420.7 (10 seconds). The engine did not operate exactly as planned during the flight. Thrust was erratic, possibly as a result of helium ingestion into the engine oxidizer feed line.
CM/SM separation occurred at T+1455.0, at an altitude of 138.9 nautical miles (159.8 statute miles/257.2 kilometers) and 3,660 nautical miles (4,211 statute miles/6,778 kilometers) down range. The command module was now traveling at a speed of 25968 fps (17,705 miles per hour/28,494 kilometers per hour). During reentry, the maximum deceleration was 14.3 gs. The Apollo capsule landed near Ascension Island in the South Atlantic Ocean, 4,577 nautical miles (5,267 statute miles/8,477 kilometers) from Cape Canaveral, and about 45 miles from the primary recovery ship. (S. 8.18°, W 11.15°) Total duration of the flight was 37 minutes, 19.7 seconds.
The Apollo spacecraft was recovered by USS Boxer (LPH- 4), a Wasp-class amphibious assault ship, and taken to Norfolk, Virginia.
Mission AS-201 was successful, though several problems occurred during the flight. These were identified and corrected on the following production vehicles.
Apollo/Saturn IB AS-201 at Launch Complex 34, 4 February 1966. (NASA S-66-21307)
Apollo/Saturn IB AS-201 was approximately 223 feet, 4 inches (68.072 meters) tall. The total vehicle weight was 1,320,220 pounds (598,842 kilograms).
The Apollo command module of AS-201 was Spacecraft 009 (CM-009), a Block I capsule. (Various crew equipment had not been installed for this test flight.) The Apollo was a conical space capsule designed and built by North American Aviation’s Space and Information Systems Division in Downey, California, to carry a crew of three astronauts on space missions of two weeks or longer. The capsule had a length of 11 feet, 1.5 inches (3.3909 meters) and maximum diameter of 12 feet, 10 inches (3.9116 meters). The service module, also built by North American Aviation, was 12 feet, 11 inches (3.937 meters) long and 12 feet, 10 inches (3.9116 meters) in diameter.
Construction of CM-009 began in 1963. It was accepted 20 October 1965 and shipped to the Kennedy Space Center, arriving at the Manned Spacecraft Operations Building (MSOB) on 25 October. The CSM was stacked on the vehicle 26 December 1965. The Launch Escape System was added 24 January 1966.
Between the CSM and the Saturn IB was the Spacecraft-Lunar Module Adapter (SLA) structure, also built by NAA. This conical section had a length of 28 feet, 0 inches (8.5344 meters) and tapered from a diameter of 12 feet, 10 inches (3.9116 meters) to 21 feet, 8 inches (6.604 meters). No Lunar Module was carried on this flight.
Saturn IB SA-201 at Launch Complex 34. The launch vehicle consists of an S-IB first stage, S-IVB second stage, and an Instrumentation Unit. (NASA 65-H-2067)
The Saturn IB two-stage launch vehicle was numbered SA-201. It consisted of an S-IB first stage, an S-IVB second stage, an Instrumentation Unit, and various fairings and adapters. It was capable of launching a 46,000 pound (20,865 kilogram) payload to Earth orbit.
The Saturn IB SA-201 S-IB first stage is lifted onto Launch Pad 34, 19 August 1965. Several of the stage’s eight stabilizing fins are not present during this maneuver. (NASA KSC-65C-5347)
The S-IB first stage was built by Chrysler Corporation Space Division at the Michoud Assembly Facility near New Orleans, Louisiana. The S-IB was 80 feet, 2 inches (24.435 meters) long, with a diameter of 21 feet, 5.0 inches (6.528 meters). The empty weight of this stage was 92,500 pounds (41,957 kilograms). Eight Redstone rocket fuel tanks containing the RP-1 fuel (a highly-refined kerosene) surrounded a Jupiter rocket tank containing the liquid oxygen oxidizer (LOX). It had a propellant capacity of 880,500 pounds (399,388 kilograms). The stage had eight stabilizing fins.
The S-IB was powered by eight Rocketdyne H-1 engines. The H-1s were built by the North American Aviation Rocketdyne Division, Canoga Park, California. Total thrust of the S-IB stage was 1,666,460 pounds (7,417.783 kilonewtons) at Sea Level,⁴ and it carried sufficient propellant for a maximum 4 minutes, 22.57 seconds of burn. This could lift the vehicle to an altitude of 37 nautical miles (69 kilometers).
A Saturn IB S-IVB second stage with its Rocketdyne J-2 engine and adapter section. (This S-IVB was part of Saturn IB SA-206.) (NASA 67-HC-26)
The S-IVB second stage was assembled at the Douglas Aircraft Company Missile & Space Division, Huntington Beach, California. The S-IVB was 61 feet, 4.555 inches (18.708497 meters) long, with a maximum diameter of 21 feet, 8.0 inches (6.604 meters). The second stage had an empty weight of 23,400 pounds (10,614 kilograms), and fuel capacity of 228,500 pounds (103,646 kilograms).
It was powered by a single Rocketdyne J-2 engine, fueled by liquid hydrogen (LH2) and LOX. The J-2 produced 229,714 pounds of thrust (1,021.819 kilonewtons), at high thrust, and 198,047 pounds (880.957 kilonewtons) at low thrust). The second stage carried enough fuel for 7 minutes, 49.50 seconds burn at high thrust.
The Instrumentation Unit, containing the Saturn’s guidance systems and attached to the top of the S-IVB stage, was designed by NASA’s Manned Space Flight Center (MSFC), and built by IBM at the Space Systems Center, Huntsville, Alabama. It was 3 feet, 0 inches (0.9 meters) tall with a diameter of 22 feet, 0 inches (6.7056 meters).
After being recovered, the AS-201 Apollo command module was used for drop tests. It is at the Strategic Air and Space Museum, Ashland, Nebraska.
Apollo Command Module CM-009 at the Strategic Air and Space Museum, Ashland, Nebraska. (HrAtsuo)
¹ NASA vehicle designations can sometimes be confusing. In this case, “AS-201” designates the all-up Apollo/Saturn IB Space Vehicle, number 201, including the first and second stages, the instrument package, lunar module adapter, service module, command module CM-009, and Launch Escape System (LES). “Spacecraft SC-009” refers to the LES, the CSM and the SLA. The “Saturn IB SA-201,” refers to just the two-stage launch vehicle, number 201: the S-IB first stage, S-IVB second stage, and the Instrumentation Unit. It does not include the payload.
² Range Zero, T-0 (“tee minus zero”), is the last full second before liftoff. This is the time reference for all mission events. In this case, T-0 was 16:12:01.000 UTC (11:12:01 a.m., Eastern Standard Time).
³ Lift off is defined as the instant of Instrumentation Unit umbilical disconnect. This is distinct from “First Motion.”
⁴ The total thrust the the eight H-1 engines of the S-IB first stage was only slightly more than that of just one of the five Rocketdyne F-1 engines of the Saturn V’s S-IC first stage booster.