Tag Archives: Test Pilot

3 December 1945

Lieutenant Eric M. Brown, MBE, DSC, RNVR. © IWM (A 31015)
Lieutenant Eric M. Brown, M.B.E., D.S.C., Royal Navy. © IWM (A 31015)

3 December 1945: The first landing and takeoff aboard an aircraft carrier by a jet-powered aircraft were made by Lieutenant-Commander Eric Melrose Brown, M.B.E., D.S.C., R.N.V.R., Chief Naval Test Pilot at RAE Farnborough, while flying a de Havilland DH.100 Sea Vampire Mk.10, LZ551/G. The ship was the Royal Navy Colossus-class light aircraft carrier, HMS Ocean (R68), under the command of Captain Casper John, R.N.

For his actions in these tests, Lieutenant-Commander Brown was invested an Officer of the Most Excellent Order of the British Empire (O.B.E.), 19 February 1946.

LZ551 was the second of three prototype DH.100 Vampires, which first flew 17 March 1944. The airplane was used for flight testing and then in 1945, was modified for operation for carriers. It was named “Sea Vampire” and reclassified as Mk.10.

The DH.100 was a single-seat, single-engine fighter powered by a turbojet engine. The twin tail boom configuration of the airplane was intended to allow a short exhaust tract for the engine, reducing power loss in the early jet engines available at the time.

LZ551/G was originally powered by a Halford H.1 turbojet which produced 2,300 pounds of thrust (10.231 kilonewtons) at 9,300 r.p.m. This engine was produced by de Havilland and named Goblin.

The Vampire entered service with the Royal Air Force in 1945 and remained a front-line fighter until 1953. 3,268 DH.100s were built. There were two prototype Sea Vampires (including LZ551) followed by 18 production Sea Vampire FB.5 fighter bombers and 73 Sea Vampire T.22 two-place trainers.

LZ551 is in the collection of the Fleet Air Arm Museum, Yeovilton, Somerset.

Captain Eric ("Winkle") Brown, RNAS, aboard HMS Ocean, 3 December 1945. (Daily Mail)
Lieutenant-Commander Eric (“Winkle”) Brown, MBE, DSC, RNVR, with the second prototype de Havilland DH.100, LZ551, aboard HMS Ocean, 3 December 1945. (Daily Mail)

HMS Ocean was built at the Alexander Stephen and Sons yard on the Clyde, Glasgow, Scotland. The ship was launched in 1944 and commissioned 8 August 1945. Classed as a light fleet carrier, HMS Ocean was 630 feet (192 meters) long at the water line, with a beam of 80 feet, 1 inch (24.41 meters) and standard draft of 18 feet, 6 inches (5.64 meters) at 13,190 tons displacement; 23 feet, 3 inches (7.09 meters), at full load displacement (18,000 tons). The aircraft carrier’s  flight deck was 695 feet, 6 inches (212.0 meters) long. Ocean was driven by four Parsons geared steam turbines producing 40,000 shaft horsepower, and had a maximum speed of 25 knots (28.8 miles per hour/46.3 kilometers per hour). HMS Ocean had a crew of 1,050 sailors, and could carry 52 aircraft.

HMS Ocean served for twelve years before being placed in reserve. Five years later, she was scrapped at Faslane, Scotland.

Winkle Brown and the DH.100 Sea Vampire fly past HMS Ocean.
Winkle Brown and the DH.100 Sea Vampire fly past HMS Ocean.
A landing signal officer guides Brown to land aboard HMS Ocean.
De Havilland Sea Vampire Mk.10 catches the arresting wire aboard HMS Ocean, 3 December 1945.
De Havilland Sea Vampire Mk.10 LZ551/G catches the arresting wire aboard HMS Ocean, 3 December 1945.
De Havilland Sea Vampire Mk.10 lands aboard HMS Ocean, 3 December 1945. (BAE Systems)
De Havilland Sea Vampire Mk.10 takes off from HMS Ocean, 3 December 1945. (BAE Systems)

Captain Eric Melrose Brown, C.B.E., D.S.C., A.F.C., KCVSA, Ph.D., Hon. F.R.Ae.S., R.N., is one of aviation’s greatest test pilots. He was born at Leith, Scotland, 21 January 1918, the son of Robert John Brown and Euphemia Melrose Brown. His father, a Royal Air Force officer, took him for his first flight at the age of 8. He was educated at the Royal High School, Edinburgh, Scotland; Fettes College; and at the University of Edinburgh. He received a Master of Arts degree from the university in 1947.

This unidentified Royal Navy Fleet Air Arm petty officer appears to be Eric Brown.

Eric Brown volunteered for the Royal Navy Fleet Air Arm, 4 December 1939. Having previously learned to fly at the University Air Squadron, Brown was sent to a Flying Refresher Course at RNAS Sydenham, Belfast, Northern Ireland.

Sub-Lieutenant Eric Melrose Brown, Royal Navy Volunteer Reserve, circa 1939.

Brown received a commission as a temporary Sub-Lieutenant, Royal Navy Volunteer Reserve, 26 November 1940. He briefly served with No. 801 Squadron before being transferred to No. 802 Squadron. He flew the Grumman G-36A Martlet Mk.I (the export version of the U.S. Navy F4F-3 Wildcat fighter) from the escort carrier HMS Audacity (D10) on Gibraltar convoys.

Having shot down several enemy aircraft, including two Focke-Wulf Fw 200 Condor four-engine patrol bombers, Brown was awarded the Distinguished Service Cross. HMS Audacity was sunk by enemy submarines in the Atlantic, 21 December 1941. Brown was one of only 24 to escape from the sinking ship, but only he and one other survived long enough in the frigid water to be rescued.

Ensign Eric M.Brown with a Grumman Martlet Mk.I
Sub-Lieutenant Eric M.Brown, R.N.V.R., Fleet Air Arm, with a Grumman Martlet Mk.I, circa 1941. (Unattributed)

Sub-Lieutenant Brown met Miss Evelyn Jean Margaret Macrory on 7 April 1940. They married in 1942 and would have one son.

Brown was promoted to lieutenant, 1 April 1943. After a number of operational assignments, Lieutenant Brown was assigned to the Naval Test Squadron at the Aeroplane and Armament Experimental Establishment, Boscombe Down, in December 1943. The following month Brown was named Chief Naval Test Pilot at the Royal Aircraft Establishment, Farnborough. He held that post until 1949.

In July 1945, Eric Brown was promoted to the rank of lieutenant-commander (temporary), and then, following the war, he was transferred from the Royal Navy Volunteer Reserve to the Royal Navy, and appointed a lieutenant with date of rank to 1 April 1943.

Lieutenant Brown was awarded the King’s Commendation for Valuable Service in the Air in the New Year’s Honours List, 1949. Brown returned to No. 802 Squadron during the Korean War, flying from the aircraft  carriers HMS Vengeance (R71) and HMS Indomitable (92). He was promoted to lieutenant-commander, 1 April 1951. In September 1951, Brown resumed flight testing as an exchange officer at the U.S. Naval Air Test Center, Patuxent River, Maryland.

Commander and Mrs. Brown at RNAS Lossiemouth, circa 1954. (Daily Mail)
Commander and Mrs. Brown at RNAS Lossiemouth, circa 1954. (Daily Mail)

In 1953, Lieutenant-Commander Brown was a ship’s officer aboard HMS Rocket (H92), an anti-submarine frigate. He was promoted to commander, 31 December 1953. After a helicopter refresher course, Brown commanded a Search-and-Rescue (SAR) helicopter flight aboard HMS Illustrious. He next commanded No. 804 Squadron based at RNAS Lossiemouth, then went on to command RNAS Brawdy at Pembrokeshire, Wales.

From 1958 to 1960, Commander Brown was the head of the British Naval Air Mission to Germany. He then held several senior positions in air defense within the Ministry of Defence. He was promoted to captain 31 December 1960.

From 1964 to 1967, Brown was the Naval Attache at Bonn, Germany. He next commanded RNAS Lossiemouth, 1967–1970.

Captain Brown’s final military assignment was as Aide-de-camp to Her Majesty, Queen Elizabeth II of Great Britain.

Eric M. Brown was invested a Member of the Most Excellent Order of the British Empire (M.B.E.), 3 July 1945, for landings of a de Havilland DH.98 Mosquito aboard HMS Indefatigable, 2 May 1944. On 1 January 1970, Captain Brown was named a Commander of the Most Excellent Order of the British Empire (C.B.E.) in the Queen’s New Years Honours List.

Captain Eric Melrose Brown, CBE, DSC, AFC Hob FRAeS, RN
Captain Eric Melrose Brown, C.B.E., D.S.C., A.F.C., K.C.V.S.A., Ph.D., Hon. F.R.Ae.S., Royal Navy

Captain Eric Melrose Brown, C.B.E., D.S.C., A.F.C., K.C.V.S.A., Ph.D. Hon. F.R.Ae.S., R.N., retired from active duty 12 March 1970.

At that time, he had accumulated more than 18,000 flight hours, with over 8,000 hours as a test pilot. Captain Brown had flown 487 different aircraft types (not variants), a record which is unlikely to ever be broken. Brown made more landings on aircraft carriers than any other pilot, with 2407 landings, fixed wing, and 212 landings, helicopter. He made 2,721 catapult launches, both at sea and on land.

In 1982 and 1983, Captain Brown served as president of the Royal Aeronautical Society.

Eric “Winkle” Brown died at Redhill, Surrey, England, 21 February 2016, at the age of 97 years.

Captain Brown with the De Havilland DH.100 Sea Vampire Mk.10, LZ551, at the Fleet Air Arm Museum, Yeovilton. (Nigel Cheffers-Heard, Fleet Air Arm Museum)
Captain Eric M. Brown with the De Havilland DH.100 Sea Vampire Mk.10, LZ551, at the Fleet Air Arm Museum, Yeovilton, Somerset, England. (Nigel Cheffers-Heard, Fleet Air Arm Museum)

© 2018, Bryan R. Swopes

1 December 1984

NASA 833, a remotely-piloted Boeing 720 airliner, pulls up after a practice approach to the impact point on Rogers Dry Lake. The "X" is the planned touchdown point. The "rhino" barriers are at the runway threshold. (NASA)
NASA 833, a remotely-piloted Boeing 720 airliner, pulls up after a practice approach to the impact point on Rogers Dry Lake. The “X” is the planned touchdown point. The “rhino” barriers are at the runway threshold. (NASA)

After four years of planning and preparation, the National Aeronautics and Space Administration (NASA) and the Federal Aviation Administration (FAA) intentionally crashed a Boeing 720 airliner to test an experimental fuel additive intended to reduce post-crash fires, and to assess passenger survivability. An anti-misting agent was added to standard commercial JP-5 jet fuel to create AMK, or “Anti-Misting Kerosene.” The airliner’s fuel tanks were filled with the AMK mixture, totaling 16,060 gallons (10,794 liters). Instrumented crash test dummies were placed in the passengers seats.

Passengers relaxing before a flight aboard NASA’s Boeing 720, N833NA. (NASA ECN-28307)

NASA 833, the Boeing 720-027 airliner, FAA registration N833NA, was a remotely-piloted aircraft. NASA test pilot Fitzhugh Lee (“Fitz”) Fulton, Jr., flew NASA 833 from a ground station, the NASA Dryden Remotely Controlled Vehicle Facility. More than 60 flights had been made prior to the actual test.

Fitz Fulton in the CID.
Fitz Fulton in the NASA Dryden Remotely Controlled Vehicle Facility

The test was planned so that the airliner would make a shallow 3.8° approach to a prepared runway on the east side of Rogers Dry Lake at Edwards Air Force Base. It was to land on its belly in a wings-level attitude, then slide into a group of barriers, called “rhinos,” which would slice open the wing tanks. The fuselage and passenger cabin would remain intact. NASA and the FAA estimated that this would be “survivable” for all occupants.

Just before touchdown, the Boeing 720 entered a "Dutch roll." The airliner's nose yawed to the left and the left wing dipped, striking the ground sooner than was planned. All four engines are still at full throttle. NASA 833 is to the right of the runway center line. (NASA)
Just before touchdown, the Boeing 720 entered a “Dutch roll.” The airliner’s nose yawed to the left and the left wing dipped, striking the ground sooner than was planned. All four engines are still at full throttle. NASA 833 is to the right of the runway center line. (NASA)

As the Boeing 720 descended on its Final Approach, its nose yawed to the right and the airplane went to the right of the runway center line. It then yawed back to the left and entered an out-of-phase oscillation called a “Dutch roll.” The decision height to initiate a “go-around” was 150 feet (45.7 meters) above the surface of the lake bed. Fitz Fulton thought he had enough time to get NASA 833 back on the center line and committed to the test landing. However, the Dutch roll resulted in the airliner’s left wing impacting the ground with the inboard engine on the left wing (Number Two) just to the right of the center line.

NASA 833 slews left as it approaches the test apparatus. The Boeing 720 has reached the intended touchdown point but is out of position, still to the right of center line and misaligned. (NASA)
NASA 833 slews left as it approaches the test apparatus. The Boeing 720 has reached the intended touchdown point but is out of position, still to the right of center line and misaligned. (NASA)

According to the test plan, all four of the airliner’s engines should have been brought to idle, but they remained at full throttle. The left wing’s impact yawed the airliner to the left and, rather than the fuselage passing through the rhino barriers undamaged, the passenger compartment was torn open. Another rhino sliced into the Number Three engine (inboard, right wing), opening its combustion chamber. With the fuel tanks in the wings ruptured, raw fuel was sprayed into the engine’s open combustion chamber which was still at full throttle.

As the airliner slides through the "rhino" barriers, they rip open the fuel tanks, the Number Three engine and the passenger compartment. The raw fuel immediately ignited. (NASA)
As the airliner slides through the “rhino” barriers, they rip open the fuel tanks, the Number Three engine and the passenger compartment. The raw fuel immediately ignited. (NASA)

The raw fuel ignited and exploded into a fireball. Flames immediately entered the passenger compartment. As the 720 slid on the runway it continued to rotate left and the right wing broke off though the fuselage remained upright.

NASA 833's right wing breaks off, rupturing the fuel tanks. Nearly 8,000 gallons (30,000 liters) of jet fuel pours out into the fireball. (NASA)
NASA 833’s right wing breaks off, rupturing the fuel tanks. Nearly 8,000 gallons (30,000 liters) of jet fuel pours out into the fireball. (NASA)

As the right wing came off the ruptured fuel tanks emptied most of the raw fuel directly into the fireball.

The flaming wreckage of NASA 833 slides to a stop on Rogers Dry Lake. Fire fighters needed more than one hour to extinguish the fire. (NASA)
The flaming wreckage of NASA 833 slides to a stop on Rogers Dry Lake. Fire fighters needed more than one hour to extinguish the fire. (NASA)

Over an hour was required to extinguish the flames. The test of the flame-reducing fuel additive was a complete failure. Test engineers estimated that 25% of the occupants might have survived the crash, however, it was “highly speculative” that any could have escaped from the burning, smoke-filled passenger compartment.

Fithugh L. "Fitz" Fulton, Jr. (NASA)
Fitzhugh Lee “Fitz” Fulton, Jr., with NASA 905, a Shuttle Carrier Aircraft, and Enterprise (OV-101). (NASA)
Fitz Fulton, 1942 (The Cohiscan)

Fitzhugh Lee Fulton, Jr., was born at Blakely, Georgia, 6 June 1925, the first of two sons of Fitzhugh Lee Fulton, a merchant seaman, and Manila Fulton. He attended Columbus High School, Columbus Georgia, graduating in 1942. He entered College at Alabama Polytechnic Institute (now known as Auburn University) and the University of Oklahoma. He was awarded a bachelor of arts degree from Golden Gate University, San Francisco, California.

Fulton entered the U.S. Army Air Corps in 1943, and was trained as a pilot. He married Miss Erma I. Beck at Tucson, Arizona, 16 December 1945. They would have three children.

Following World War II, participated in Operation Crossroads, the atomic bomb tests at Bikini Atoll, July 1946. Lieutenant Fulton flew the Douglas C-54 Skymaster four-engine transport during the Berlin Airlift, making 225 sorties, and then the Douglas B-26 Invader light attack bomber during the Korean War.

Captain Fitz Fulton, U.S. Air Force, in teh cockpit of a Douglas B-26 Invader, circa 1952. (Air & Space Magazine)
Captain Fitz Fulton, U.S. Air Force, in the cockpit of a Douglas B-26 Invader, circa 1952. (Air & Space Magazine)

Fulton graduated from the Air Force Test Pilot School in 1952. He served as project test pilot for the Convair B-58 Hustler supersonic bomber and flew the B-58 to a World Record Altitude of 26,017.93 meters (85,360.66 feet) on 14 September 1962.¹

Major Fitz Fulton in the cockpit of a Convair B-58. (Jet Pilot Overseas)
Major Fitz Fulton in the cockpit of a Convair B-58. (Jet Pilot Overseas)

At Edwards Air Force Base, he flew the B-52 “mother ships” for the X-15 Program. He flew the North American XB-70A Valkyrie faster than Mach 3. When Fulton retired from the Air Force in 1966, he was a lieutenant colonel assigned as Chief of Bomber and Transport Test Operations.

Fitz Fulton continued as a research test pilot for NASA, flying as project pilot for the YF-12A and YF-12C research program. He flew all the early test flights of the NASA/Boeing 747 Shuttle Carrier Aircraft and carried the space shuttle prototype, Enterprise. By the time he had retired from NASA, Fulton had flown more than 16,000 hours in 235 aircraft types.

Fitzhugh L. Fulton, Jr., died at Thousand Oaks, California, 4 February 2015, at the age of 89 years..

Lieutenant Colonel Fitzhugh Lee Fulton, Jr., with a North American Aviation XB-70A Valkyrie.
Colonel Joseph Frederick Cotton and Lieutenant Colonel Fitzhugh Lee Fulton, Jr., with a North American Aviation XB-70A Valkyrie.

NASA 833 (c/n 18066) was ordered by Braniff Airways, Inc., as N7078, but the sale was not completed. The airplane first flew 5 May 1961 and it was delivered to the Federal Aviation Administration as a test aircraft one week later, 12 May 1961, registered N113. A few years later the identification was changed to N23, then back to N113, and then once again to N23. In 1982, the Boeing 720 was transferred to NASA to be used in the Controlled Impact Demonstration. At this time it was registered as N2697V. A final registration change was made to N833NA.

NASA 833 at Edwards Air Force Base, prior to the Controlled Impact Demonstration. (Paul)

The Boeing 720 was a variant of the Model 707, intended for short to medium range flights. It had 100 inches (2.54 meters) removed from the fuselage length and improvements were made to the wing, decreasing aerodynamic drag, though it retained the span of the 707.

The Boeing 720 was powered by four Pratt & Whitney Turbo Wasp JT3C-7 turbojet engines, a civil variant of the military J57 series. The 720B was equipped with the more efficient P&W JT3D-1 turbofan engines. The JT3C-7 was a “two-spool” axial-flow engine with a 16-stage compressor (9 low- and 7 high-pressure stages), 8 combustion tubes, and a 3-stage turbine (1 high- and 2 low-pressure stages). It was rated at 12,030 pounds of thrust (53.512 kilonewtons) for takeoff. The JT3D-1 was a dual axial-flow turbofan engine, with a 2-stage fan section 13-stage compressor (6 low- and 7 high pressure stages), 8 combustion chambers and a 4-stage turbine (1 high- and 3 low-pressure stages). This engine was rated at 14,500 pounds of static thrust (64.499 kilonewtons) at Sea Level, and 17,000 pounds (75.620 kilonewtons), with water injection, for takeoff (2½ minute limit). Almost half of the engine’s thrust was produced by the fans. Maximum engine speed was 6,800 r.p.m. (N1) and 10,200 r.p.m. (N2). It was 11 feet, 4.64 inches (3.471 meters) long, 4 feet, 5.00 inches (1.346 meters) wide and 4 feet, 10.00 inches (1.422 meters) high. It weighed 4,165 pounds (1,889 kilograms). The JT3C could be converted to the JT3D configuration during overhaul.

The maximum cruise speed of the Boeing 720 was 611 miles per hour (983 kilometers per hour) and maximum speed was 620 miles per hour (1,009 kilometers per hour). The range at at maximum payload was 4,370 miles (7,033 kilometers).

Boeing built 154 720 and 720B airliners from 1959 to 1967.

The Federal Aviation Administration's Boeing 720-027 N113. (FAA)
The Federal Aviation Administration’s Boeing 720-027 N113. (FAA)

¹ FAI Record File Numbers 14652 and 14656

© 2018, Bryan R. Swopes

29 November 1945

A Sikorsky R-5 flown by Jimmy Viner with Captain Jack Beighle, lifts a crewman from Texaco Barge No. 397, aground on Penfield Reef, 29 November 1945. (Sikorsky Historical Archive)
A Sikorsky YR-5A flown by Jimmy Viner with Captain Jack Beighle, hoists a crewman from Texaco Barge No. 397, aground on Penfield Reef, 29 November 1945. (Sikorsky Historical Archive)

29 November 1945: During a storm, Texaco Barge No. 397 broke loose and drifted onto Penfield Reef, approximately one mile (1.6 kilometers) off shore Fairfield, Connecticut. The storm was breaking the barge apart and the two crewmen, Captain Joseph Pawlik and Steven Penninger, were in danger.

On shore, witnesses has seen the flares fired during the night by the two seamen, but with the stormy conditions were unable to effect a rescue. Local police called the nearby Sikorsky Aircraft Corporation factory at Bloomfield, where new R-5 helicopters were being built for the U.S. Army, and asked if they could do anything.

Sikorsky’s chief test pilot Dimitry D. (“Jimmy”) Viner and the U.S. Army representative at the factory, Captain Jackson E. Beighle, U.S. Army Air Forces, took an available helicopter, flew to the scene and assessed the situation. Viner was not able to land the helicopter on the barge, so they returned to the factory where a new Army YR-5A had recently been equipped with an external rescue hoist. The R-5 was quickly prepared for flight (which involved reinstalling one of its three main rotor blades) and then Viner and Beighle flew it back to the barge.

While Viner hovered in the high winds, Captain Beighle operated the rescue hoist, lowering it to the barge where Seaman Penninger looped the leather harness under his arms. Beighle raised the harness with Penninger to the cabin but could not pull him inside. Penninger hung on to Beighle while Viner flew the helicopter to the beach.

With Jimmy Viner at the controls, the Sikorsky YR-5A lowers Captain Joseph Pawlik to the sand at Fairfield Beach, Connecticut, 29 November 1945. The helicopter’s serial number is difficult to read, but it may be 43-46608. (Sikorsky Historical Archive)
With Jimmy Viner at the controls, the Sikorsky YR-5A lowers Captain Joseph Pawlik to the sand at Fairfield Beach, Connecticut, 29 November 1945. The helicopter’s serial number is difficult to read, but it may be 43-46608. (Sikorsky Historical Archive)

After lowering Penninger to the beach, Viner took the R-5 back to the barge to pick up Captain Pawlik. When Beighle attempted to raise the hoist it jammed, leaving Pawlik suspended 30 feet (9 meters) below the helicopter. Viner again returned to the shore and carefully lowered Pawlik to the sand.

The United States Coast Guard had demonstrated the use of the rescue hoist a few months earlier, but this was the first time it had been used during an actual emergency.

(Left to right, Dimitry D. Viner, Sikorsky chief test pilot, Steven Penninger and Joesph Pawlik, rescued from Texaco barge No. 397, and Captain Jackson E. Beighle, U.S. Army Air Forces. (Sikorsky Historical Archive)
(Left to right, Dimitry D. Viner, Sikorsky chief test pilot, Captain Joseph Pawlik, Seaman Steven Penninger, rescued from Texaco Barge No. 397, and Captain Jackson E. Beighle, U.S. Army Air Forces. (Sikorsky Historical Archive)

The rescue can be seen in this YouTube video, beginning at about the 16-minute mark:

The Sikorsky YR-5A (Model S-48) was a single-engine, two-place helicopter. The cabin was built of aluminum with plexiglas windows. The fuselage was built of plastic-impregnated plywood and the tail boom was wood monocoque construction. The main rotor consisted of three fully-articulated blades built of wood spars and ribs and covered with fabric. The three bladed semi-articulated tail rotor was built of laminated wood. The main rotor turned counter-clockwise as seen from above. (The advancing blade is on the helicopter’s right.) The tail rotor was mounted on the helicopter’s left side in a pusher configuration. It turned clockwise as seen from the helicopter’s left.

YR-5A 43-46608 was one of one of twenty-six service test helicopters built between November 1944 and July 1945. There were slight changes from the earlier five XR-5A prototypes. The R-5A went into production in July 1945 and more than 300 had been built by the time production ended in 1951.

The helicopter’s fuselage was 41 feet, 7.5 inches (12.687 meters) long. The main rotor had a diameter of 48 feet (14.630 meters) and tail rotor diameter was 8 feet, 5 inches (2.2.565 meters), giving the helicopter an overall length of 57 feet, 1 inch (17.399 meters) with rotors turning. It was 13 feet, 1.5 inches (4.001 meters) high. The landing gear tread was 12 feet (3.7 meters). The R-5A had an empty weight of 3,780 pounds (1,714.6 kilograms) and maximum takeoff weight of 4,900 pounds (2,222.6 kilograms). Fuel capacity was 100 gallons (378.5 liters).

The helicopter was powered by an air-cooled, supercharged, 986.749-cubic-inch-displacement (16.170 liter) Pratt & Whitney Wasp Jr. T1B4 (R-985 AN-5) direct-drive, nine-cylinder radial engine which was placed vertically in the fuselage behind the crew compartment. This engine was rated at 450 horsepower at 2,300 r.p.m., Standard Day at Sea Level. The R-985 AN-5 was 48.00 inches (1.219 meters) long, 46.25 inches (1.175 meters) in diameter and weighed 684 pounds (310.3 kilograms) with a magnesium crankcase.

The R-5 had a maximum speed (Vne) of 107 knots (123.1 miles per hour/198.2 kilometers per hour). Range was 275 miles (442.6 kilometers). The service ceiling was 14,800 feet (4,511 meters). The absolute hover ceiling was 3,000 feet (914.4 meters).

Dimitry D. ("Jimmy") Viner with a Sikorsky S-51, the civil version of the R-5. (Sikorsky Historical Archive)
Dimitry D. (“Jimmy”) Viner with a Sikorsky S-51, the civil version of the R-5, photographed in 1995. (Sikorsky Historical Archive)

© 2016, Bryan R. Swopes

25 November 1940

The first Martin Marauder, B-26-MA 40-1361, takes off for the first time at Middle River, Maryland, 25 November 1940. (U.S. Air Force)
The first Martin Marauder, B-26-MA 40-1361, takes off for the first time at Middle River, Maryland, 25 November 1940. (U.S. Air Force)

25 November 1940: Glenn L. Martin Company’s engineer and test pilot William Kenneth Ebel, co-pilot Ed Fenimore and flight engineer Al Malewski made the first flight of the first B-26 Marauder, Army Air Corps serial number 40-1361.

The B-26 was a twin-engine medium bomber designed with high speed as a primary objective. Production of the new airplane was considered so urgent that there were no prototypes. All aircraft were production models.

Martin B-26-MA Marauder 40-1361, right profile, with bomb bay doors open. (U.S. Air Force)
Martin B-26-MA Marauder 40-1361, right profile, with engines idling. (U.S. Air Force)

The B-26 Marauder was 58 feet, 2.5 inches (17.742 meters) long with a wingspan of 65 feet, 0 inches (19.812 meters) ¹ and overall height of 19 feet, 10.3 inches (6.053 meters). At the root, the wings’ chord was 12 feet, 10.5 inches (3.924 meters), with an angle of incidence of 3° 30′. The wing center section had no dihedral, while the the outer panels had +1° 17′. The total wing area was 602 square feet (56 square meters). The bomber had an empty weight of 21,375 pounds (9,696 kilograms) and gross weight of 32,025 pounds (14,526 kilograms).

The prototype was powered by two air-cooled, supercharged, 2,804.4-cubic-inch-displacement (45.956 liter), Pratt & Whitney R-2800-5 two-row, 18-cylinder radial engines with a compression ratio of 6.65:1. The R-2800-5 had a Normal Power rating of 1,500 horsepower at 2,400 r.p.m. to 7,500 feet (2,286 meters) and a Takeoff/Military Power rating of 1,850 horsepower at 2,600 r.p.m. to 2,700 feet (823 meters). They turned 13 foot, 6 inch (4.115 meter) diameter four-bladed, constant-speed Curtiss Electric propellers through a 2:1 gear reduction. The R-2800-5 was 6 feet, 3.72 inches (1.923 meters) long, 4 feet, 4.06 inches (1.322 meters) in diameter, and weighed 2,270 pounds (1,030 kilograms).

40-1361 had a maximum speed of 326 miles per hour (525 kilometers per hour) at 14,250 feet (4,343 meters) with the engines turning 2,400 r.p.m. Its service ceiling was 25,000 feet (7,620 meters), and the absolute ceiling was 26,200 feet (7,986 meters).

Martin B-26-MA Marauder 40-1361, the first production airplane, 25 November 1940. (U.S. Air Force)
Martin B-26-MA Marauder 40-1361, the first production airplane, 25 November 1940. (U.S. Air Force)

When the B-26 entered service, it quickly gained a reputation as a dangerous airplane and was called the “widowmaker,” and also had several less polite nicknames. The airplane had relatively short wings with a small area for its size. This required that landing approaches be flown at much higher speeds than was normal practice. With one engine out, airspeed was even more critical. Some changes were made, such as a slight increase of the wingspan and the size of the vertical fin and rudder. At the same time, an emphasis was made on airspeed control during training. During World War II, the Marauder had the lowest rate of combat losses of any American bomber.

Prototype Martin B-26 40-1361 taxiing. (U.S. Air Force)
Prototype Martin B-26 40-1361 taxiing. (U.S. Air Force)

201 B-26s were built before production switched to the B-26A. Glenn L. Martin Co. produced 5,288 Marauders between 1941 and 1945, with manufacturing taking place at Middle River, Maryland, and Omaha, Nebraska. The Marauder served in the Pacific, Mediterranean and European combat areas, with both the United States and several Allied nations. When it was removed from service at the end of World War II, the “B-26” designation was reassigned to the Douglas A-26 Invader, a twin-engine light bomber.

The first Martin Marauder, B-26-MA 40-1361, was written off after a belly landing at Patterson Field, Ohio, 8 August 1941.

Martin B-26 40-1361 with engines turning, 28 November 1940. (U.S. Air Force)
Martin B-26 40-1361 with engines turning, 28 November 1940. (U.S. Air Force)

William Kenneth Ebel was born at Orangeville, Illinois, 2 January 1899. He was the first of two sons of Willam Henry Ebel, a farmer, and Nora Agnes Rubendall Ebel.

Ken Ebel attended Heidelberg College at Tiffin, Ohio. While at Heidelberg, on 1 October 1918, he enlisted as a private in the Student Army Training Corps (S.A.T.C.). With World War I coming to an end in November, Private Ebel was discharged 20 December 1918. Ebel graduated from Heidelberg in 1921 with a bachelor of arts degree.

Ebel returned to military service, enlisting as a private in the 104th Squadron (Observation), Maryland National Guard, based at Baltimore, Maryland.

Ebel continued his college education at the Case School of Applied Science in Cleveland, Ohio. In 1923, he earned a bachelor of science degree in mechanical engineering (B.S.M.E.)

Ken Ebel, 104th Observation Squadron.

On 11 September 1923, Private Ebel was appointed an aviation cadet, graduating from primary flying school on 3 June 1924. He received a commission as a 2nd lieutenant, Officers Reserve Corps (O.R.C.), United States Army, on 12 June 1925.

Continuing to serve as a reserve officer, in 1926 Ebel went to work as an engineer for the Glenn L. Martin Company, then located in Cleveland, Ohio. As a test pilot and engineer, Ebel flew the Martin M-130 four-engine flying boat.

2nd Lieutenant Ebel,still with the 104th Squadron, Maryland National Guard, was promoted to the rank of 1st lieutenant on 21 December 1928. The U.S. Army advanced his rank to 1st lieutenant, Air Corps, 15 February 1929.

On 21 October 1929, William K. Ebel married Miss Florence E. Sherck at Seneca, Ohio. They would have two children, William Kenneth, Jr., and Lydia Lynn Ebel.

While testing a Martin BM-2 dive bomber, on 11 August 1932, W.K. Ebel “leaped to safety in a parachute Friday when a bombing plane he was testing failed to come out of a spin and crashed at Dahlgren, Virginia. The plane was going through its final tests before being delivered to the navy. It was wrecked in the crash.” Ebel became Member No. 495 of The Caterpillar Club.

Martin M-130 NX14714 during engine testing. (Glenn L. Martin Co.)

On Thursday, 20 December 1934, Chief Pilot Ken Ebel took the new four-engine Martin M-130 flying boat, Pan American Airways System’s Hawaii Clipper, for its first flight from Middle River, Maryland. He also made the first flight of the M-156 “Russian Clipper” in 1935.

Ebel was promoted to captain, Air Corps, on 5 January 1935. On 21 August, he delivered the new Martin Model 146 “mystery bomber” to Wright Field for evaluation by the Bombardment Board.

The Martin Model 146 medium bomber prototype at Wright Field for evaluation, 1935. (Ray Wagner Collection, San Diego Air & Space Museum Archives)

In 1942, Ken Ebel earned a doctorate (Ph.D.) in engineering from the Case School of Applied Science.

On 3 July 1942, Ken Ebel took the Martin XPB2M-1 Mars flying boat prototype for its first flight.

Martin XPB2M-1 Mars taxi test, 1942. (Charles M. Daniels Collection, San Diego Air & Space Museum Archives)

In 1948, Ken Ebel became director of the Airplane Division of the Curtiss-Wright Corporation in Columbus, Ohio. Soon after, Curtiss-Wright sold its airplane division to North American Aviation. In 1950, the U.S. Navy’s primary submarine builder, the Electric Boat Company, appointed Ebel as Vice Pressident of Engineering for its Canadair Ltd., aircraft manufacturing subsidiary in Montreal, Quebec, Canada. (In 1952, after acquiring Convair, the corporation reorganized as General Dynamics.

William K. Ebel

Ebel returned to the United States in 1961 and served as a consultant for General Dynamics in Washington, D.C. Ebel retired in 1963, purchasing teh Mount Pleasant Orchards near Baltimore.

Mrs. Ebel died in 1968. He later married Helene H. Topping.

William Kenneth Ebel, Ph.D., died at the Greater Baltimore Medical Center, 12 July 1972.

¹ The wing span was increased to 71 feet, 0 inches (21.641 meters) with the B-26B-10-MA.

© 2018, Bryan R. Swopes

25 November 1940

The prototype de Havilland DH.98 Mosquito, W4050, takes off on its first flight at Hatfield, 25 November 1940. (BAE Systems)

25 November 1940: De Havilland Aircraft Company’s Chief Test Pilot, Geoffrey Raoul de Havilland, Jr., and engineer John Walker, made the first flight of the DH.98 Mosquito prototype, E0234, at Hatfield, Hertfordshire, England. The prototype’s Royal Air Force identification was W4050. The multi-role combat aircraft was constructed primarily of layers of balsa covered with layers of birch, then a layer of doped cotton fabric. It was powered by two Rolls-Royce Merlin V-12 engines.

Sir Geoffrey de Havilland, Jr, with a DH.98 Mosquito, 14 October 1943. (Photo by Reg Speller/Fox Photos/Getty Images 3320005)

The construction materials took advantage of plentiful supplies of wood, and also made workers who were not in the standard metal aircraft industry able to take part.

The prototype was rolled out 19 November 1040, painted overall yellow.

The prototype de Havilland DH.98 Mosquito, E0234, outside the Assembly Building, 19 November 1940. (BAE Systems)

The prototype had a wingspan of 54 feet, 2 inches (16.510 meters), and its gross weight was 19,670 pounds (8,922 kilograms). W4050 was powered by two liquid-cooled, supercharged, 1,648.96-cubic-inch-displacement (27.01 liter) Rolls-Royce Merlin Mk.21 single overhead camshaft (SOHC) 60° V-12 engines, producing 1,460 horsepower at 3,000 r.p.m. at 10,000 feet (3028 meters), with 10 pounds (0.69 Bar) of boost, and driving three-bladed de Havilland Hydromatic propellers through a gear reduction.

The prototype DH.98 Mosquito,now marked W4050, in the field behind Salisbury Hall (where it was designed and built) just before its first flight, 25 November 1940. (HistoryNet)

The DH.98 had been predicted to be 20 miles per hour (32 kilometers per hour) faster than the Supermarine Spitfire, but was actually much faster. In testing, the prototype reached 392 miles per hour (631 kilometers per hour) at 22,000 feet (6,706 meters). Improvements were continuously made, and with 2-stage superchargers, W4050 reached a maximum 437 miles per hour (703 kilometers per hour). The DH.98 prototype had a service ceiling of 34,000 feet (10,363 meters) and range of 2,180 miles (3,500 kilometers).

The production fighter variant, the Mosquito F. Mk.II, was 41 feet, 2 inches (12.548 meters) long with a wingspan of 54 feet, 2 inches (16.510 meters) and height of 15 feet, 3 inches (4.648 meters) in 3-point position. The wings had 1½° incidence with approxmatey 2½° dihedral. The leading edges were swept aft 2½°. The total wing area was 436.7 square feet (40.6 square meters). The fighter’s empty weight was 13,356 pounds (6,058 kilograms) and the maximum takeoff weight was 18,649 pounds (8,459 kilograms). The Mk.II had a total fuel capacity of 553 gallons.

The Mk.II had a cruise speed of 265 miles per hour (426 kilometers per hour) at 15,000 feet (4,572 meters) and maximum speed of 380 miles per hour (612 kilometers per hour) at 21,400 feet (6,523 meters).

Mosquito bomber variants could carry four 500 pound bombs, or two 2,000 pound bombs, but were otherwise unarmed. Fighters were equipped with four Hispano Mk.II 20 mm autocannon and four Browning .303-caliber Mk.II machine guns in the nose.

6,411 DH.98 Mosquitoes were built in England, 1,134 in Canada and 212 in Australia. It was produced in bomber, fighter, night fighter, fighter bomber and photo reconnaissance versions.

The prototype DH.98 Mosquito, W4050, at Hatfield, Hertfordshire. (Royal Air Force)

W4050’s (the prototype’s Royal Air Force identification) fuselage was damaged while taxiing at Boscombe Down, 24 February 1941, and had to be replaced with one intended for a second prototype, W4051. It remained at de Havilland and was used to test different engines, armaments and versions. After a series of tests conducted in December 1943, the prototype Mosquito was permanently grounded. It was used as an instructional airframe and later placed in storage.

In September 1958, W4050 was turned over to the de Havilland Aircraft Heritage Centre. Today, the restored prototype DH.98 Mosquito is at the museum at London Colney, Hertfordshire, England.

The Mosquito prototype with camouflauged upper surfaces as it appeared at Boscombe Down, (de Havilland Aircraft Museum)
The Mosquito prototype with camouflaged upper surfaces as it appeared at Boscombe Down, 1941. (de Havilland Aircraft Museum)

© 2020, Bryan R. Swopes