Tag Archives: Sikorsky S-65

15 March 1967

Sikorsky HH-53B 66-14428, Super Jolly Green Giant, first flight at Stratford, Connecticut, 15 March 1967. (Sikorsky Historical Archives)

15 March 1967: The first Sikorsky HH-53B, 66-14428, made its maiden flight at Stratford, Connecticut. In the cockpit were Sikorsky test pilots James R. (“Dick”) Wright and Patrick A. Guinn. The helicopter would be called the “Super Jolly Green Giant.”

A variant of the United States Navy/Marine Corps CH-53A Sea Stallion, the Super Jolly Green Giant was the largest, most powerful, and fastest helicopter in the United States Air Force inventory. Configured for combat search and rescue (CSAR) and special operations, the HH-53B was equipped for inflight refueling and was armed with three General Electric GAU/2A 7.62 mm miniguns or .50-caliber Browning machine guns. The HH-53B can be visually distinguished from other H-53s by the two diagonal sponson support struts on each side of the fuselage.

U.S. Air Force Sikorsky HH-53B Super Jolly Green Giant in flight near the Sikorsky plant at Stratford, Connecticut. (Sikorsky Historical Archives)
U.S. Air Force Sikorsky HH-53B Super Jolly Green Giant in flight near the Sikorsky plant at Stratford, Connecticut. (Sikorsky Historical Archives)

The HH-53B Super Jolly Green Giant was flown by two pilots and was crewed by a flight engineer/gunner, two additional gunners, and one or two pararescue jumpers (“PJs”). It has an overall length of 88 feet, 2.4 inches (26.833 meters) with rotors turning. With the refueling boom extended the total length of the helicopter is 91 feet, 11.34 inches (28.025 meters). The fuselage is 67 feet, 2.4 inches (20.483 meters) long and 8 feet (2.438 meters) wide. The height to the top of the main rotor pylon is 17 feet, 1.68 inches (5.224 meters). The maximum height (rotors turning) is 24 feet, 10.88 inches (7.592 meters).

A gunner looks over a General Electric GAU2/A minigun, while his aircraft flies formation with a Sikorsky HH-53C Super Jolly Green Giant over Southeast Asia. (U.S. Air Force)
A flight engineer looks over a General Electric GAU-2/A minigun while his helicopter flies formation with a Sikorsky HH-53C Super Jolly Green Giant of the 40th Aerospace Rescue and Recovery Squadron, Vietnam, October 1972. (Ken Hackman, U.S. Air Force)

The HH-53B’s fully-articulated 6-blade main rotor has a diameter of 72 feet, 2.7 inches (22.014 meters). The main rotor turns counter-clockwise at 185 r.p.m. (100% Nr), as seen from above. (The advancing blade is on the helicopter’s right.) The main rotor blades are built with titanium spars and have -16° of twist. The semi-articulated four-blade tail rotor has a diameter of 16 feet, 0 inches (4.877 meters) and is positioned on the left side of the tail pylon. It turns clockwise at 792 r.p.m., as seen from the helicopter’s left side. (The advancing blade is below the axis of rotation.) The gap between rotor arcs is just 4.437 inches (11.270 centimeters).

A U.S. Air Force Sikorsky HH-53C Super Jolly Green Giant hovers to hoist a pararescueman with one downed pilot, while a second waits on the ground. The blade tip vortices are visible because of the high humidity. (National Archives at College Park)

The HH-53B had an empty weight of 26,500 pounds (12,020 kilograms). Its maximum takeoff weight was 42,000 pounds (19,051 kilograms).

The HH-53B was originally equipped with two General Electric T64-GE-3 turboshaft engines, producing 3,080-shaft horsepower, each. The T64 is an axial flow free-turbine turboshaft engine. It has a 14-stage compressor and 4-stage turbine (2 high-pressure and 2 low pressure). The turbine shaft is coaxial with the compressor shaft and delivers power forward.

The helicopter had a cruise speed of 150 knots (173 miles per hour/278 kilometers per hour), and a maximum speed of 170 nautical miles per hour (196 miles per hour/315 kilometers per hour). The service ceiling was 20,400 feet (6,218 meters). Its range is 600 nautical miles (690 statute miles/1,111 kilometers), and it is capable of inflight refueling.

A Sikorsky HH-53B Super Jolly Green Giant refuels from a Lockheed HC-130P Combat King over Vietnam, circa 1970. (U.S. Air Force)

The Air Force ordered eight HH-53Bs, followed by 58 improved HH-53C Super Jolly Green Giants.¹ The first HH-53B, 66-14428, was delivered to the Air Force Air Rescue and Recovery Service at the Sikorsky plant in June 1967. It was flown to Eglin Air Force Base, Florida by Lieutenant Colonel James Dixon and Captain Fredric Donohue of Detachment 2, 37th Air Rescue and Recovery Squadron. For the next two months ARRS crews trained with it at Eglin.

The first Sikorsky HH-53Bs arrive in Vietnam, 1967. (U.S. Air Force)

Along with the second HH-53B, the new helicopter was then shipped to Vũng Tàu, Republic of Vietnam, aboard the former U.S. Navy escort carrier, USNS Card (T-AKV-40) for assignment to the 37th Aerospace Rescue and Recovery Squadron at Udorn Royal Thai Air Force Base. They were soon joined by four more HH-53Bs.

As upgraded HH-53Cs became available, the six -53Bs were returned to the United States, where some were used as trainers, and others as test aircraft for the development of the Pave Imp and Pave Low systems. 4428 was one of five HH-53Bs modified to the initial Pave Low configuration. This was followed by the HH-53H Pave Low II configuration.

In 1988, all HH-53 and CH-53 helicopters in the U.S. Air Force inventory began to be modified to the MH-53J Pave Low III Enhanced special operations configuration. The modifications, along with incorporation of a Service Life Extension Program (SLEP) were performed by Naval Air Rework Facility (NARF) at NAS Pensacola, Florida, or by the Marine Corps aviation depot at MCAS Cherry Point, North Carolina.

After nearly 40 years of service, 66-14428 was sent to The Boneyard at Davis-Monthan Air Force Base, Tucson, Arizona, 7 January 2007. By September 2008, all U.S. Air Force Pave Low helicopters had been withdrawn from service.

The first super Jolly Green Giant, 66-14428, now upgraded to an MH-53J Pave Low IIIE, assigned to the 551st Special operations Squadron, 58th Speciqal operations Wing, in flight near Kirtland Air Force Base, New Mexico, 24 March 2000. (U.S. Air Force)
Super Jolly Green Giant 66-14428, now upgraded to an MH-53J Pave Low IIIE, assigned to the 551st Special Operations Squadron, 58th Special Operations Wing, in flight near Kirtland Air Force Base, New Mexico, 24 March 2000. The diagonal struts above each outboard fuel tank show its HH-53B origin. This was the first Super Jolly Green Giant. (Master Sergeant Dave Dolan, U.S. Air Force)

Highly recommended: On A Steel Horse I Ride: A History of the MH-53 Pave Low Helicopters in War and Peace, by Darrel D. Whitcomb, Air University Press, 2012

¹ By the time the United States withdrew from the Vietnam War, Sikorsky had produced 52 HH-53B and -53C Search and rescue helicopters, and 20 CH-53C transports. Of these, 9 HH-53s and 7 CH-53s were destroyed in combat, and 2 HH-53s and 1 CH-53 were lost in accidents in the United States.

© 2023, Bryan R. Swopes

14 October 1964

Prototype Sikorsky YCH-53A Sea Stallion, Bu. No. 151613, 14 october 1964. (Sikorsky Archives)
Prototype Sikorsky YCH-53A Sea Stallion, Bu. No. 151613, 14 October 1964. (Sikorsky Archives)

14 October 1964: The first prototype Sikorsky YCH-53A  Sea Stallion, Bu. No. 151613, made its first flight at the Sikorsky plant at Stratford, Connecticut. (Sikorsky Model S-65, serial number 65001.)

The fuselage of the YCH-53A was similar in configuration to the smaller CH-3C (S-61R). It used the dynamic components from the CH-37 Mojave (S-56) and CH-54A Tarhe (S-64).

U.S. Marine Corps Sikorsky CH-53A Sea Stallion (Wikimedia)

The Sikorsky CH-53A Sea Stallion is a twin-engine heavy-lift transport helicopter operated by two pilots. It is 88 feet, 2.4 inches (26.883 meters) with rotors turning. The fuselage is 67 feet, 2.4 inches (20.483 meters) long  and 8 feet, 10 inches (2.692 meters) wide. The six-blade fully articulated main rotor is 72 feet, 2.7 inches (22.014 meters) in diameter and turns counterclockwise as seen from above. (The advancing blade is on the helicopter’s right.) Main rotor speed is 185 r.pm. The four-blade semi-articulated tail rotor has a diameter of 16 feet (4.877 meters) and is placed on the left side of the tail rotor pylon in a pusher configuration. It turns clockwise as seen from the helicopters left. (The advancing blade is below the axis of rotation.) Overall height (rotors turning) of the Sea Stallion is 24 feet, 10.8 inches (7.599 meters). The tail rotor speed is 792 r.p.m.

The CH-53A is powered by two General Electric T64-GE-6 turboshaft engines rated at 2,850 shaft horsepower, each. Performance of the CH-53D (T64-GE-413, 3,925 s.h.p) has a maximum speed (Vne) of 130 knots (241 kilometers per hour) service ceiling of 16,750 feet (5,105 meters) and range with maximum payload of 540 miles (870 kilometers)

Two YCH-53A prototypes were built, followed by 139 CH-53A Sea Stallion production models.

The CH-53 was developed into the three-engine CH-53E Super Stallion. The current production variant is the CH-53K King Stallion.

Sikorsky HH-53B 66-14428, Super Jolly Green Giant, first flight at Stratford, Connecticut, 15 March 1967. (Sikorsky Historical Archives)
Sikorsky CH-53E Super Stallion at Mojave, California, 9 September 2007. (Alan Redecki/Wikipedia)
This photograph by Alan Radecki of a Sikorsky CH-53E Super Stallion taking off at Mojave, California, 20 September 2007, is too exciting not to include. (Akradecki/Wikipedia)
Sikorsky CH-53K King Stallion at West Palm Beach, Florida, 2 March 2017. (Lance Corporal Molly Hampton, United States Marine Corps)

© 2017 Bryan R. Swopes